Pages

Thursday 29 April 2010

Dog 2 finished and new news

Hello there, back again with some new news. I am currently working on a set for Leeds Theatre Group's 'An Ideal Husband' which will be on at Sevenarts theatre in Leeds from the 6th to the 8th of May. More pictures of that after it has gone up. In the meantime, Here is the second section of the second Dog puppet build. When you joined me last, I was attempting to find all the materials to make the puppet from the local area, however, for the body I had to make a concession and get hold of materials from the store. I needed something which could act in the same way as the pipe I found for Dog 1, but couldn't bet on finidng something just right at that time. In the end, I went for a sheet of wire mesh which I could shape well, which would be light and easy to fix to the frame. I coupled this with some felt and stuffing from a sacrificial pillow of mine. Other than that, the mechanisms worked in the same way as the previous dog. here are the pictures. I've also included some more pictures of the original dog and the Phaedra's Love model box and set.

No comments:

Post a Comment